{"help": "https://demo.datashades.com/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "dc4273bb-d643-5ded-b585-f5b98cd38fac", "total_estimation_threshold": null, "records": [{"_id":1,"PERMIT_NBR":"20041-20001-32651","PRIMARY_ADDRESS":"837 N CAHUENGA BLVD","ZIP_CODE":"90038","CD":"13","PIN_NBR":"141B185    80","APN":"5533028019","ZONE":"MR1-1-SN","APC":"Central","CPA":"Hollywood","CNC":"Central Hollywood","HL":null,"CT":"1918.20","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/03/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"05/03/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.08637","LON":"-118.32899","WORK_DESC":"05-03-2023, Changes to an approved set of plan, changes include revised elevator size to 20HP, update conductor size and OCPD, all changes has been clouded. Plan check only, permit covered under master application, 20041-20000-32651","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":2,"PERMIT_NBR":"19041-10001-03017","PRIMARY_ADDRESS":"3011 E PICO BLVD","ZIP_CODE":"90023","CD":"14","PIN_NBR":"118-5A223 104","APN":"5169004001","ZONE":"M3-1-CUGU","APC":"East Los Angeles","CPA":"Boyle Heights","CNC":"Boyle Heights","HL":null,"CT":"2051.20","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/25/2020 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"10/20/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.01862","LON":"-118.21515","WORK_DESC":"PC ONLY. Changes to appropeved set of plans. Changes to the feeder schedule, service volatage rating and conduit size. All changes are clouded under delta 1.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":3,"PERMIT_NBR":"23041-10000-71304","PRIMARY_ADDRESS":"20111 W PICCADILLY LANE","ZIP_CODE":"91326","CD":"12","PIN_NBR":"213B113   427","APN":"2701087040","ZONE":"[T]RE-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Porter Ranch","HL":"YES","CT":"1082.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/01/2023 12:00:00 AM","ISSUE_DATE":"01/10/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"01/31/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.28377","LON":"-118.57266","WORK_DESC":"NEW ROOF-MOUNTED PV SYSTEM - 8.40 KW (21 MODULES) WITH (N)200A LOAD CENTER AND 13 KWH ESS","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":4,"PERMIT_NBR":"20041-10000-25464","PRIMARY_ADDRESS":"613 E FRONTENAC AVE","ZIP_CODE":"90065","CD":"1","PIN_NBR":"148-5A223 165","APN":"5465008029","ZONE":"R1-1","APC":"East Los Angeles","CPA":"Northeast Los Angeles","CNC":"Arroyo Seco","HL":"YES","CT":"1851.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"08/04/2020 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Reviewed by Supervisor","STATUS_DATE":"08/17/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.10216","LON":"-118.21334","WORK_DESC":"[E-plan] New rooftop solar system with energy storage system consisting of 12 modules x 4.08 kw pv array 13.5 KWH ESS200A Load Center125A Load Center","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":5,"PERMIT_NBR":"21041-10000-59412","PRIMARY_ADDRESS":"18646 W RUNNYMEDE ST","ZIP_CODE":"91335","CD":"3","PIN_NBR":"186B121   583","APN":"2118009017","ZONE":"R1-1","APC":"South Valley","CPA":"Reseda - West Van Nuys","CNC":"Reseda","HL":null,"CT":"1310.20","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/22/2021 12:00:00 AM","ISSUE_DATE":"10/13/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"01/07/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.20556","LON":"-118.54006","WORK_DESC":"[ePlan] PV1. Installation of roof mounted solar modules using central inverter PV system. System size: 5.18 KW DC,  with (14) PV Modules (370W) with optimizers and (1) central inverter (SE5000H-US).","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":6,"PERMIT_NBR":"22041-10000-32056","PRIMARY_ADDRESS":"7415 N BALCOM AVE","ZIP_CODE":"91335","CD":"4","PIN_NBR":"186B129   804","APN":"2120030016","ZONE":"R1-1","APC":"South Valley","CPA":"Reseda - West Van Nuys","CNC":"Reseda","HL":null,"CT":"1318.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/12/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Info Complete","STATUS_DATE":"07/19/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.20532","LON":"-118.5209","WORK_DESC":"[EPLAN]PV1, Roof mounted solar system using 27 modules with  microinverters, andd (1) combiner box interconnecting through the main service panel. Total system size is  10.80 KW(DC) /7.8KW(AC) . Main panel upgrade shall be pulled as a separate permit.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":7,"PERMIT_NBR":"21141-10003-20477","PRIMARY_ADDRESS":"18934 W CELTIC ST","ZIP_CODE":"91326","CD":"12","PIN_NBR":"210B121   700","APN":"2718012019","ZONE":"RS-1","APC":"North Valley","CPA":"Northridge","CNC":"Northridge West","HL":null,"CT":"1112.04","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/27/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"01/04/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.26875","LON":"-118.54608","WORK_DESC":"EPLAN. CHANGES TO AN APPROVED SET. CHANGES INCLUDE: DOWNSIZE OF PV PANELS.__________________________________________________________________________________ Going from 52 panels to 49 panels","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":8,"PERMIT_NBR":"20041-20000-00657","PRIMARY_ADDRESS":"1945 S LA CIENEGA BLVD","ZIP_CODE":"90034","CD":"10","PIN_NBR":"126B173   632","APN":"4302033270","ZONE":"C2-1VL-CPIO","APC":"South Los Angeles","CPA":"West Adams - Baldwin Hills - Leimert","CNC":"South Robertson","HL":null,"CT":"2696.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/07/2020 12:00:00 AM","ISSUE_DATE":"05/14/2020 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"02/26/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.04142","LON":"-118.37693","WORK_DESC":"FULL PC FOR POWER AND ENERGY. INSTALLING NEW 800A (120/240V 3P, 4W) SERVICE.SCOPE OF WORK INCLUDES NEW PANELS, EQUIPMENT, LIGHTING. SCOPE OF WORK PER BUILDING \"CHANGE OF USE FROM RESTAURANT (1205 SQ.FT.) TO OFFICE.  EXTERIOR ALTERATION AND T.I. TO THE (E) 2 STORY COMERCIAL BLDG. \"","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":9,"PERMIT_NBR":"21041-10000-21356","PRIMARY_ADDRESS":"10138 N MILWOOD AVE","ZIP_CODE":"91311","CD":"12","PIN_NBR":"204B105   521","APN":"2747006046","ZONE":"RS-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Chatsworth","HL":null,"CT":"1133.21","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/04/2021 12:00:00 AM","ISSUE_DATE":"06/16/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"07/07/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.25469","LON":"-118.59396","WORK_DESC":"[E-Plan] New roof mounted PV1 solar system consisting of 36 modules (LR4-60HPB 350M), 36 optimizers (SE P370) with 1 central inverter (SE11400H-US). System size is 12.6kWDC / 11.4kWACSolar PV installation shall comply with Los Angeles Fire Department's Fire Prevention Bureau (FPB) Requirement No. 96","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":10,"PERMIT_NBR":"22041-10000-48432","PRIMARY_ADDRESS":"2203 S CAMDEN AVE","ZIP_CODE":"90064","CD":"5","PIN_NBR":"126B153   684","APN":"4322017024","ZONE":"R1-1","APC":"West Los Angeles","CPA":"West Los Angeles","CNC":"Westside","HL":null,"CT":"2678.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/26/2022 12:00:00 AM","ISSUE_DATE":"10/26/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/03/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.04098","LON":"-118.43621","WORK_DESC":"[eplan] Install 6.825 kWDC roof mounted PV system (21) modules with 7.6 kW central inverter and (2) DC-coupled battery storage units 19.6 kWh.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":11,"PERMIT_NBR":"22041-10000-68567","PRIMARY_ADDRESS":"10023 S ST ANDREWS PL","ZIP_CODE":"90047","CD":"8","PIN_NBR":"091-5A193 114","APN":"6058004011","ZONE":"R1-1","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":"Empowerment Congress Southwest Area","HL":null,"CT":"2380.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/29/2022 12:00:00 AM","ISSUE_DATE":"01/10/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"08/04/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.94465","LON":"-118.31135","WORK_DESC":"[EPLAN] PV1 Solar Roof Mount 6.4 KW DC (4.64KW AC) using 16 Modules, 16 Microinverters and a combiner box.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":12,"PERMIT_NBR":"23041-10000-72560","PRIMARY_ADDRESS":"9712 S EVERS AVE","ZIP_CODE":"90002","CD":"15","PIN_NBR":"093A213   435","APN":"6048005011","ZONE":"R1-1","APC":"South Los Angeles","CPA":"Southeast Los Angeles","CNC":"Watts","HL":null,"CT":"2423.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/08/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"12/16/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.94789","LON":"-118.24706","WORK_DESC":"[E-Plan] Plan check Only. Permit pulled under express permit 23041-90000-56418. New PV1 roof mounted solar system consisting of 15 modules, 15 optimizers and 1 central inverter. System size is 6.1kWDC/7.6kWAC","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":13,"PERMIT_NBR":"21141-10000-20011","PRIMARY_ADDRESS":"11745 N PRIMROSE CT","ZIP_CODE":"91326","CD":"12","PIN_NBR":"216B109   520","APN":"2701096091","ZONE":"[T]RE-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Porter Ranch","HL":"YES","CT":"1082.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/29/2021 12:00:00 AM","ISSUE_DATE":"12/28/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"06/22/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.28623","LON":"-118.58186","WORK_DESC":"[ePlan][PV1]Installation of a new 6.30 kW PV system with 18 modules with integrated microinverters and 100A solar load center.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":14,"PERMIT_NBR":"22041-10000-39396","PRIMARY_ADDRESS":"525 N PERUGIA WAY","ZIP_CODE":"90077","CD":"5","PIN_NBR":"141B149   243","APN":"4362010011","ZONE":"RE20-1-HCR","APC":"West Los Angeles","CPA":"Bel Air - Beverly Crest","CNC":"Bel Air-Beverly Crest","HL":"YES","CT":"2621.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"08/23/2022 12:00:00 AM","ISSUE_DATE":"09/26/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/19/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.07944","LON":"-118.44726","WORK_DESC":"$0 PERMIT FEE DUE TO AB1414PV1 PLAN CHECK FOR NEW PV AND ESS. ESS SIZE IS 10 KWH. PV SYSTEM SIZE IS 13.6 KW DC/12.597 KW AC CEC. SCOPE OF WORK CONSISTS OF (34) PV MODULES WITH OPTIMIZERS, A INVERTER, A BATTERY, AND (2) PANELS","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":15,"PERMIT_NBR":"22041-10000-17208","PRIMARY_ADDRESS":"1656 W ENTERPRISE DR","ZIP_CODE":"90732","CD":"15","PIN_NBR":"027B193   399","APN":"7442041001","ZONE":"PVSP","APC":"Harbor","CPA":"Wilmington - Harbor City","CNC":"Northwest San Pedro","HL":"YES","CT":"9800.15","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/20/2022 12:00:00 AM","ISSUE_DATE":"04/28/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"12/29/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.76858","LON":"-118.30915","WORK_DESC":"[EPLAN] PV1,  Residential roof mounted pv solar system 3.150kwDC, with 9 Modules, 9 microinverters Inverters","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":16,"PERMIT_NBR":"21041-10000-15603","PRIMARY_ADDRESS":"5926 W CARLTON WAY","ZIP_CODE":"90028","CD":"13","PIN_NBR":"148-5A191 247","APN":"5545009018","ZONE":"[Q]R4-1VL","APC":"Central","CPA":"Hollywood","CNC":"Hollywood Studio District","HL":null,"CT":"1910.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/26/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Info Complete","STATUS_DATE":"09/02/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.10035","LON":"-118.31889","WORK_DESC":"[ePlan] Compete Power and lighting system design for new construction of 29 units multi family with parking garage","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":17,"PERMIT_NBR":"22041-10000-53875","PRIMARY_ADDRESS":"4735 N LOWELL AVE","ZIP_CODE":"91214","CD":"7","PIN_NBR":"201B205   642","APN":"2571004031","ZONE":"R1-1-RFA","APC":"North Valley","CPA":"Sunland-E LaTuna Cyn-Lakevw Ter-Shadow Hls-Tujunga","CNC":"Sunland-Tujunga","HL":null,"CT":"1013.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/19/2022 12:00:00 AM","ISSUE_DATE":"12/01/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"03/16/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.24512","LON":"-118.26623","WORK_DESC":"(E-PLAN)NEW PV1 ROOF-MOUNTED INSTALLATION. SCOPE OF WORK INCLUDES 24 MODULES, 24 OPTIMIZERS, AND 1 CENTRAL INVERTER.SYSTEM SIZE:9.6 KW DC; 11.4 KW AC","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":18,"PERMIT_NBR":"22041-10002-28619","PRIMARY_ADDRESS":"4322 N GRIMES PL","ZIP_CODE":"91316","CD":"4","PIN_NBR":"165B125   187","APN":"2184033020","ZONE":"RA-1","APC":"South Valley","CPA":"Encino - Tarzana","CNC":"Encino","HL":"YES","CT":"1397.03","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/24/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"05/03/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.14937","LON":"-118.52635","WORK_DESC":"[eplan] Revision to approved plans.  Change of equipment locations and elevation detail.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":19,"PERMIT_NBR":"19041-10001-52630","PRIMARY_ADDRESS":"200 E WASHINGTON BLVD","ZIP_CODE":"90015","CD":"9","PIN_NBR":"123A207   186","APN":"5127029049","ZONE":"C2-2D-O-CPIO","APC":"South Los Angeles","CPA":"Southeast Los Angeles","CNC":"South Central","HL":null,"CT":"2240.20","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/22/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"01/10/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.03031","LON":"-118.26348","WORK_DESC":"Changes to an approved set of PV2 plans. Project scope includes changes to system size from 84.15kW to 84.375kW, change of module model and quantity, updated layout and calculations, inverter changed, all calculations recalculated.Note: Permit fees are paid under the master application. Plan check only.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":20,"PERMIT_NBR":"22041-10000-21416","PRIMARY_ADDRESS":"11809 W ALLASEBA DR","ZIP_CODE":"90066","CD":"11","PIN_NBR":"117B153   294","APN":"4250002006","ZONE":"R1V2","APC":"West Los Angeles","CPA":"Palms - Mar Vista - Del Rey","CNC":"Mar Vista","HL":null,"CT":"2715.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/17/2022 12:00:00 AM","ISSUE_DATE":"05/26/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"04/17/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.01882","LON":"-118.43732","WORK_DESC":"Eplan: Plan check for a New solar installation rated at 7kWDC / 5kWAC with (20) modules and microinverters.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":21,"PERMIT_NBR":"20041-20001-37873","PRIMARY_ADDRESS":"17041 W LABRADOR ST","ZIP_CODE":"91325","CD":"12","PIN_NBR":"201B133   208","APN":"2692012007","ZONE":"RA-1","APC":"North Valley","CPA":"Northridge","CNC":"Northridge East","HL":null,"CT":"1151.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/20/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"01/21/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.24934","LON":"-118.50421","WORK_DESC":"Revision to approved set.  Service equipment rating changes, derating main breaker.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":22,"PERMIT_NBR":"23041-10001-37807","PRIMARY_ADDRESS":"16737 W ADDISON ST","ZIP_CODE":"91436","CD":"4","PIN_NBR":"171B137   198","APN":"2259003022","ZONE":"R1-1","APC":"South Valley","CPA":"Encino - Tarzana","CNC":"Encino","HL":null,"CT":"1397.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/06/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"09/28/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.16324","LON":"-118.49803","WORK_DESC":"[ePlan] (PC Only) Changes to an approved PV1 plan. Changes include updated equipment location and PV layout. PC for clouded changes only.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":23,"PERMIT_NBR":"21041-10000-21048","PRIMARY_ADDRESS":"18123 W MIRANDA ST","ZIP_CODE":"91356","CD":"3","PIN_NBR":"174B125   225","APN":"2157010022","ZONE":"R1-1","APC":"South Valley","CPA":"Encino - Tarzana","CNC":"Tarzana","HL":null,"CT":"1392.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/04/2021 12:00:00 AM","ISSUE_DATE":"06/24/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"07/30/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.1746","LON":"-118.52814","WORK_DESC":"[EPLAN[ PV1 ROOF MOUNTED SYSTEM. SCOPE OF WORK INCLUDES: (29) PV MODULES WITH OPTIMIZERS,  (1) SE3800H & (1) SE6000H-US INVERTER, (1) 100PV LOAD CENTER THAT IS CONNECTED TO AN EXISTING 200A MSP. SYSTEM SIZE: 9.80KW AC.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":24,"PERMIT_NBR":"21041-10000-09527","PRIMARY_ADDRESS":"4401 S CRENSHAW BLVD 3RD FLOOR","ZIP_CODE":"90008","CD":"8","PIN_NBR":"111B185   131","APN":"5013013013","ZONE":"C2-2D-SP","APC":"South Los Angeles","CPA":"West Adams - Baldwin Hills - Leimert","CNC":"Park Mesa Heights","HL":null,"CT":"2345.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/17/2021 12:00:00 AM","ISSUE_DATE":"06/16/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"09/12/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.00332","LON":"-118.33201","WORK_DESC":"PLAN CHECK FOR T-24 ONLY. SCOPE OF WORK INCLUDES LIGHTING, CONTROLS, AND CIRCUITS. TOTAL AFFECTED AREA: 14534 SQFT.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":25,"PERMIT_NBR":"23041-10000-18965","PRIMARY_ADDRESS":"16919 W MARLIN PL","ZIP_CODE":"91406","CD":"6","PIN_NBR":"183B133   574","APN":"2230005019","ZONE":"R1-1","APC":"South Valley","CPA":"Reseda - West Van Nuys","CNC":"Lake Balboa","HL":null,"CT":"1320.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/28/2023 12:00:00 AM","ISSUE_DATE":"04/05/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"05/10/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.19721","LON":"-118.50204","WORK_DESC":"[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 12.5KW DC / 10.1KWAC. SYSTEM INCLUDES 31 MODULES WITH MICRO-INVERTERS AND A NEW COMBINER BOX. SYSTEM IS INTERCONNECTED TO A NEW 225A MSP.NOTE MPU SHALL BE UNDER SEPERATE EXPRESS PERMIT","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":26,"PERMIT_NBR":"22041-10000-59033","PRIMARY_ADDRESS":"8740 S HOBART BLVD","ZIP_CODE":"90047","CD":"8","PIN_NBR":"096A193    80","APN":"6037025043","ZONE":"R1-1","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":"Empowerment Congress Southwest Area","HL":null,"CT":"2384.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/10/2022 12:00:00 AM","ISSUE_DATE":"11/10/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"04/04/2023 12:00:00 AM","TYPE_LAT_LON":"PIN","LAT":"33.95772524","LON":"-118.30756783","WORK_DESC":"(EPlan) PV1 PC for installation of roof mounted solar panels. PV system includes 8 modules with 8 optimizers and 1 central inverter system connected to existing main service panel.  System size is 3.2kW DC/3kW AC.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":27,"PERMIT_NBR":"23041-10001-18025","PRIMARY_ADDRESS":"6348 E CHURCH ST","ZIP_CODE":"90042","CD":"14","PIN_NBR":"157-5A233 239","APN":"5486030023","ZONE":"R1-1","APC":"East Los Angeles","CPA":"Northeast Los Angeles","CNC":"Historic Highland Park","HL":"YES","CT":"1831.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/22/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"05/02/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.12447","LON":"-118.17756","WORK_DESC":"**EXPEDITED PER APPLICANT REQUEST**[EPLAN] NEW ROOFTOP MOUNTED PV1 INSTALLATION WITH (27) MODULES, (27) OPTIMIZERS, (1) CENTRAL INVERTER, (1) ESS DEVICE ALL INTERCONNECTED TO AN EXISTING 200A MSP. SYSTEM SIZE IS: 10.66KWDC / 7.6KWAC.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":28,"PERMIT_NBR":"22041-10002-03113","PRIMARY_ADDRESS":"24583 W OVERLAND DR","ZIP_CODE":"91304","CD":"12","PIN_NBR":"186B085    36","APN":"2017032001","ZONE":"RE11-1-H","APC":"South Valley","CPA":"Canoga Park-West Hills-Winnetka-Woodland Hills","CNC":"West Hills","HL":null,"CT":"1344.24","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"08/25/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"03/23/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.20901","LON":"-118.6587","WORK_DESC":"E-plan. Changed panel type and feeder length.  PLAN CHECK ONLY","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":29,"PERMIT_NBR":"20041-20002-01053","PRIMARY_ADDRESS":"14964 W LARKSPUR ST","ZIP_CODE":"91342","CD":"7","PIN_NBR":"228B149   429","APN":"2502012075","ZONE":"R1-1","APC":"North Valley","CPA":"Sylmar","CNC":"Sylmar","HL":null,"CT":"1064.06","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/30/2020 12:00:00 AM","ISSUE_DATE":"01/30/2020 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"01/30/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.32034","LON":"-118.45854","WORK_DESC":"Changes to approved plans.  Removal of (1) energy storage system unit from system design - energy storage capacity modified to 13.5 kWh.  $0 plan check/permit fee per State Assembly Bill AB 1414.(((PV1.  Install 8.1858 kW DC roof mounted PV system and 27 kWh energy storage system.  (140) PV shingles and (2) 3.84 kW rated inverters.)))","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":30,"PERMIT_NBR":"20041-10000-30005","PRIMARY_ADDRESS":"3741 S LA BREA AVE","ZIP_CODE":"90016","CD":"10","PIN_NBR":"117B177     8","APN":"5025010001","ZONE":"C2-2D-CPIO","APC":"South Los Angeles","CPA":"West Adams - Baldwin Hills - Leimert","CNC":"Empowerment Congress West Area","HL":null,"CT":"2360.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/16/2020 12:00:00 AM","ISSUE_DATE":"04/21/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"01/24/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.0188","LON":"-118.35583","WORK_DESC":"FULL POWER PLAN CHECK FOR A MEDICAL FACILITY. SCOPE OF WORK INCLUDES A TRANSFORMER OF 75 KVA, 2 NEW PANELS, CIRCUITS, AND LIGHTING TIED TO AN EXISTING SWITCHBOARD OF 800 AMPS, 277/480 V, 3-PHASE 4-WIRE.TOTAL AFFECTED AREA: 6,966 SQ FT*NOTE TO PLAN-CHECKER: PLAN BEARS TWO STAMPS AND NO LOAD CALCULATIONS.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":31,"PERMIT_NBR":"21041-10000-18679","PRIMARY_ADDRESS":"1541 S HAYWORTH AVE","ZIP_CODE":"90035","CD":"10","PIN_NBR":"129B173   928","APN":"5068018023","ZONE":"[Q]R3-1-O","APC":"Central","CPA":"Wilshire","CNC":"P.I.C.O.","HL":null,"CT":"2167.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/25/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Reviewed by Supervisor","STATUS_DATE":"06/07/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.04863","LON":"-118.36846","WORK_DESC":"Install new 1000 amp single phase service. Install new panels and equipments. NEW CONSTRUCTION OF 4 STORY MULTI-FAMILY DWELLING WITH 10 UNITS.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":32,"PERMIT_NBR":"23041-10000-33948","PRIMARY_ADDRESS":"9000 N SUNLAND BLVD","ZIP_CODE":"91352","CD":"7","PIN_NBR":"195B173   151","APN":"2544026037","ZONE":"C2-1VL","APC":"North Valley","CPA":"Sun Valley - La Tuna Canyon","CNC":"Sun Valley Area","HL":null,"CT":"1021.07","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/26/2023 12:00:00 AM","ISSUE_DATE":"11/29/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"02/21/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.23264","LON":"-118.36658","WORK_DESC":"T-24 plan check for a TI to existing space. Total affected area is 4963sq.ft","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":33,"PERMIT_NBR":"21041-10000-16518","PRIMARY_ADDRESS":"12311 W GORHAM AVE","ZIP_CODE":"90049","CD":"11","PIN_NBR":"129B141   488","APN":"4264015038","ZONE":"R2-1","APC":"West Los Angeles","CPA":"Brentwood - Pacific Palisades","CNC":null,"HL":null,"CT":"2643.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/30/2021 12:00:00 AM","ISSUE_DATE":"12/21/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"01/26/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.04717","LON":"-118.47471","WORK_DESC":"EPLAN. NEW PV1 ROOF MOUNTED SOLAR INSTALLATION. SYSTEM SIZE 5.85KW DC/ 5.0KW AC, 15 MODULES, 15 POWER OTPIMIZERS (P485), 1 CENTERAL INVERTER (SE5000H),  AND EXISTING MAIN SERVICE PANEL RATED FOR 200A.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":34,"PERMIT_NBR":"22041-10001-00126","PRIMARY_ADDRESS":"8302 N FAUST AVE","ZIP_CODE":"91304","CD":"12","PIN_NBR":"192B097   443","APN":"2004004018","ZONE":"RE9-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"West Hills","HL":null,"CT":"1132.32","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/05/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"01/16/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.21974","LON":"-118.61989","WORK_DESC":"expedited,E-plan. Installing 8.05kw photovoltaic system, (23) panels, (1) 6 kw inverter and (1) battery back up.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":35,"PERMIT_NBR":"19041-20001-41965","PRIMARY_ADDRESS":"13013 N GRADE AVE","ZIP_CODE":"91342","CD":"7","PIN_NBR":"222B157   197","APN":"2512008032","ZONE":"RS-1","APC":"North Valley","CPA":"Sylmar","CNC":"Sylmar","HL":null,"CT":"1061.13","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/22/2020 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"01/22/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.30643","LON":"-118.42067","WORK_DESC":"SUPPLEMENTAL, PLAN CHECK ONLY, PER INSPECTOR'S REQUEST. PLAN CHECK FOR NEW ROOFTOP PV SYSTEM. SYSTEM SIZE IS 6.38 KW DC/5 KW AC. SCOPE OF WORK CONSISTS OF (22) PV MODULES WITH OPTIMIZERS AND A 5KW INVERTER","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":36,"PERMIT_NBR":"22041-10000-52386","PRIMARY_ADDRESS":"20555 W RODAX ST","ZIP_CODE":"91306","CD":"3","PIN_NBR":"192B109   284","APN":"2780021008","ZONE":"RS-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Winnetka","HL":null,"CT":"1134.28","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/12/2022 12:00:00 AM","ISSUE_DATE":"04/24/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/21/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.22395","LON":"-118.58159","WORK_DESC":"(EPlan) PV1 PC for installation of roof mounted solar panels and installation of energy storage system. PV system includes 24 modules with 24 optimizers, 1 energy storage system,  1 backup loads panel, and 1 smart switch connected to existing main service panel.� Total system size is 9.72kW DC/7.68kW AC.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":37,"PERMIT_NBR":"20041-20004-35442","PRIMARY_ADDRESS":"718 E COMMERCIAL ST","ZIP_CODE":"90012","CD":"14","PIN_NBR":"130-5A217 209","APN":"5173017008","ZONE":"M3-1-RIO","APC":"Central","CPA":"Central City North","CNC":"Historic Cultural","HL":null,"CT":"2060.31","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/03/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"09/09/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.05262","LON":"-118.23244","WORK_DESC":"09/03/2021 Changes to an approved set of plan, changes include remove methane conduit seal and refeed service entrance conductor to be top feed. All changes has been clouded. Plan check only","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":38,"PERMIT_NBR":"21041-10001-23684","PRIMARY_ADDRESS":"12811 W FOOTHILL BLVD","ZIP_CODE":"91342","CD":"7","PIN_NBR":"216B161    22","APN":"2514004029","ZONE":"M1-1-CUGU","APC":"North Valley","CPA":"Sylmar","CNC":"Sylmar","HL":null,"CT":"1061.12","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/20/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Info Complete","STATUS_DATE":"05/01/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.29241","LON":"-118.41375","WORK_DESC":"[eplan] Revision to approved plans.  Revised HVAC equipment ratings, additional HVAC equipment, service equipment relocation, miscellaneous power and lighting changes.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":39,"PERMIT_NBR":"23041-10000-26605","PRIMARY_ADDRESS":"6201 N PENFIELD AVE","ZIP_CODE":"91367","CD":"3","PIN_NBR":"177B113   317","APN":"2153036001","ZONE":"RA-1VL","APC":"South Valley","CPA":"Canoga Park-West Hills-Winnetka-Woodland Hills","CNC":"Woodland Hills-Warner Center","HL":null,"CT":"1393.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/01/2023 12:00:00 AM","ISSUE_DATE":"09/15/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/25/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.18203","LON":"-118.56776","WORK_DESC":"(EPlan)Design build,  PV1 PC for installation of roof mounted solar system rated at 11.2KW DC/ 11.4KW AC including 28 modules with optimizers and 1 central inverter  connected to main service panel.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":40,"PERMIT_NBR":"23041-10002-23580","PRIMARY_ADDRESS":"2708 S MENLO AVE","ZIP_CODE":"90007","CD":"8","PIN_NBR":"123B197  1411","APN":"5055008024","ZONE":"RD1.5-1-O","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":"Empowerment Congress North Area","HL":null,"CT":"2218.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/13/2023 12:00:00 AM","ISSUE_DATE":"10/31/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/03/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.03005","LON":"-118.29019","WORK_DESC":"[ePlan] Changes to approved PV1 plans. Module layout revised on plans and address updated to 2708 S Menlo Ave. All changes under clouded area only.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":41,"PERMIT_NBR":"23041-10000-21046","PRIMARY_ADDRESS":"4211 E VERDANT ST","ZIP_CODE":"90039","CD":"13","PIN_NBR":"159B205   405","APN":"5594002028","ZONE":"MR1-1-RIO","APC":"East Los Angeles","CPA":"Northeast Los Angeles","CNC":"Atwater Village","HL":null,"CT":"1881.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/04/2023 12:00:00 AM","ISSUE_DATE":"04/11/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"04/26/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.13162","LON":"-118.2651","WORK_DESC":"PLAN CHECK FOR T24 ONLY. SCOPE OF WORK IS A T.I OF AN EXISTING COMMERCIAL STONE CUTTING SHOP FOR NEW LIGHTING AND ENERGY. INDOOR LIGHTING AREA CONSISTS OF APPROXIMATELY 3285 SQFT.\"COMPLY WITH DEPARTMENT ORDER effective date03/23/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE\".","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":42,"PERMIT_NBR":"23041-10000-58754","PRIMARY_ADDRESS":"534 W 118TH ST","ZIP_CODE":"90044","CD":"15","PIN_NBR":"084B201   793","APN":"6088025007","ZONE":"R1-1","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":"Harbor Gateway North","HL":null,"CT":"2413.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/28/2023 12:00:00 AM","ISSUE_DATE":"09/28/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"10/10/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.92602","LON":"-118.28397","WORK_DESC":"PV1 PLAN CHECK FOR NEW ROOF MOUNTED PV SYSTEM. SYSTEM SIZE IS 3.96 KW DC/3.8 KW AC. SCOPE OF WORK CONSISTS OF (9) PV MODULES WITH OPTIMIZERS AND A INVERTER","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":43,"PERMIT_NBR":"20041-10000-21641","PRIMARY_ADDRESS":"4632 W SANTA MONICA BLVD","ZIP_CODE":"90029","CD":"13","PIN_NBR":"144B197   734","APN":"5539003014","ZONE":"C2-1D","APC":"Central","CPA":"Hollywood","CNC":"East Hollywood","HL":null,"CT":"1914.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/08/2020 12:00:00 AM","ISSUE_DATE":"06/21/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"06/21/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.09073","LON":"-118.29041","WORK_DESC":"PC FOR INSTALLATION OF 2 NEW SERVICES. ONE SERVICE 3000 AMP 120/208 V 3 PHASE 4 WIRE AND. SECOND SERVICE 4000 AMP 120/208 V 3 PHASE 4 WIRE. SCOPE INCLUDES INSTALLATION OF SWITCHBOARDS, NEW SUB PANELS, MOTORS, EV CHARGERS AND ELECTRICAL EQUIPMENT FOR RESIDENTIAL UNITS. TOTAL AFFECTED ARE FOR T-24 IS 120346 SQFT.(((PER ENGINEER DWP IS OK WITH PROVIDING 2 SERVICES)))(((((PER BUILDING APPLICATION NO: 19041-10000-03850 NEW 7 STORY, TYPE IA/IIIA MIXED USE BUILDING: 6-STORY, TYPE IIIA/IA, 177-UNIT APARTMENT BUILDING OVER 1 STORY, TYPE IA, COMMERCIAL AND 2 LEVEL BASEMENT PARKING GARAGE. TOC TIER 4 PROJECT, WITH 11% OF 177 UNITS (20) RESTRICTED FOR ELI HOUSEHOLD.  AND 3 ADDITIONAL INCENTIVE))))","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":44,"PERMIT_NBR":"24041-10000-11602","PRIMARY_ADDRESS":"220 1/2 N CORONADO ST","ZIP_CODE":"90026","CD":"13","PIN_NBR":"138A203   413","APN":"5157008005","ZONE":"RD1.5-1","APC":"Central","CPA":"Westlake","CNC":"Echo Park","HL":null,"CT":"2085.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/05/2024 12:00:00 AM","ISSUE_DATE":"03/07/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"03/07/2024 12:00:00 AM","TYPE_LAT_LON":"PIN","LAT":"34.07107008","LON":"-118.274262","WORK_DESC":"New roof-mounted solar PV1 system rated 2.7kW DC / 2.0kW AC with (7) modules/microinverters and a combiner box connected to existing sub panel and existing MSP.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":45,"PERMIT_NBR":"23041-10000-07565","PRIMARY_ADDRESS":"1611-1611 1/2 W 36TH PL","ZIP_CODE":"90018","CD":"8","PIN_NBR":"120B193  1324","APN":"5041016011","ZONE":"RD2-1-O","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":"Empowerment Congress North Area","HL":null,"CT":"2225.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"02/08/2023 12:00:00 AM","ISSUE_DATE":"03/30/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"08/30/2023 12:00:00 AM","TYPE_LAT_LON":"PIN","LAT":"34.02216223","LON":"-118.30619654","WORK_DESC":"[eplan] Proposed to install 26 panels 10.27 kW DC/7.5 kw AC microinverter solar system on 1611 - 1611 1/2 ( address not in list ) roof top.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":46,"PERMIT_NBR":"21041-10000-63471","PRIMARY_ADDRESS":"3737 N BARHAM BLVD","ZIP_CODE":"90068","CD":"4","PIN_NBR":"162B181    19","APN":"5581003***","ZONE":"[Q]C2-1-SN","APC":"South Valley","CPA":"Sherman Oaks-Studio City-Toluca Lake-Cahuenga","CNC":"Hollywood Hills West","HL":"YES","CT":"1897.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/01/2021 12:00:00 AM","ISSUE_DATE":"12/09/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"12/09/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.14124","LON":"-118.34194","WORK_DESC":"[EPLAN] POWER PLAN CHECK FOR MEDIUM VOLTAGE. LADWP 400 AMP 34.5KV 3P 3W incoming service and two (2) 5000KVA, 12KV distribution substations.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":47,"PERMIT_NBR":"21041-10001-05094","PRIMARY_ADDRESS":"1111 S MATEO ST","ZIP_CODE":"90021","CD":"14","PIN_NBR":"123A217   408","APN":"5166020008","ZONE":"M3-1-RIO","APC":"Central","CPA":"Central City North","CNC":"Downtown Los Angeles","HL":null,"CT":"2060.51","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/28/2022 12:00:00 AM","ISSUE_DATE":"04/18/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"06/30/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.03013","LON":"-118.23243","WORK_DESC":"[EPLAN] SUPPLEMENTAL PC TO AN APPROVED T24 PLAN UNDER DELTA D & E CLOUDED REVISIONS. ****ORIGINAL:  ELECTRICAL PLAN RECHECK INITIATED BY INSPECTOR. PLANS HAVE BEEN APPROVED UNDER PLAN CHECK NUMBER 21041-20000-05094. APPROVAL BY ERIC GOSS.COMMERCIAL T.I. POWER AND LIGHTING WITH TITLE 24 COMPLIANCE.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":48,"PERMIT_NBR":"23041-10001-29236","PRIMARY_ADDRESS":"8720 N LAUREL CANYON BLVD","ZIP_CODE":"91352","CD":"6","PIN_NBR":"195B165   657","APN":"2634038016","ZONE":"RS-1-CUGU","APC":"North Valley","CPA":"Sun Valley - La Tuna Canyon","CNC":"Sun Valley Area","HL":null,"CT":"1212.21","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/25/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"06/30/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.22805","LON":"-118.3994","WORK_DESC":"[ePlan] (PC Only) Changes to approved PV1 plans. Revised module layout and updated feeder info from sub panel to MSP. Plan check for clouded changes only.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":49,"PERMIT_NBR":"23041-10000-39909","PRIMARY_ADDRESS":"13601 W BROWNELL ST","ZIP_CODE":"91340","CD":"7","PIN_NBR":"213B157   378","APN":"2523009010","ZONE":"R1-1-CUGU","APC":"North Valley","CPA":"Arleta - Pacoima","CNC":"Pacoima","HL":null,"CT":"1043.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/26/2023 12:00:00 AM","ISSUE_DATE":"07/11/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"07/11/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.28059","LON":"-118.42873","WORK_DESC":"[EPLAN] PV1 NEW ROOTOP MOUNTED SYSTEM, SYSTEM SIZE IS 2.32 KWac, SYSTEM INCLUDES 8 MODULES WITH MICRO-INVERTERS AND A NEW COMBINER BOX, SYSTEM IS INTERCONNECTED TO A NEW 200A MSP. NOTE THERE IS ANOTHER EXISTING SYSTEM PRESENT ON THIS ROOF AS WELL. NOTE MPU SHALL BE UNDER SEPERATE EXPRESS PERMIT","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":50,"PERMIT_NBR":"20041-20000-05096","PRIMARY_ADDRESS":"11440 N ANDASOL AVE","ZIP_CODE":"91344","CD":"12","PIN_NBR":"213B129   326","APN":"2711001013","ZONE":"RA-1","APC":"North Valley","CPA":"Granada Hills - Knollwood","CNC":"Granada Hills North","HL":null,"CT":"1066.43","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"02/04/2020 12:00:00 AM","ISSUE_DATE":"02/04/2020 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"03/10/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.27857","LON":"-118.51234","WORK_DESC":"PV1 PLAN CHECK FOR NEW ROOF MOUNTED PV SYSTEM. PV SYSTEM SIZE IS 16 KW DC/16.4 KW AC. SCOPE OF WORK CONSISTS OF (40) PV MODULES WITH OPTIMIZERS AND A 11.4 KW INVERTER, AND A 5 KW INVERTER AND 1 PANEL","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":51,"PERMIT_NBR":"23041-10000-30697","PRIMARY_ADDRESS":"22820 W MACFARLANE DR","ZIP_CODE":"91364","CD":"3","PIN_NBR":"171B097   941","APN":"2075017005","ZONE":"R1-1","APC":"South Valley","CPA":"Canoga Park-West Hills-Winnetka-Woodland Hills","CNC":"Woodland Hills-Warner Center","HL":"YES","CT":"1374.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/12/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Reviewed by Supervisor","STATUS_DATE":"06/30/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.16211","LON":"-118.62386","WORK_DESC":"[E-Plan] New PV1 ground mounted solar system consisting of 20 modules, 20 optimizers and 1 central inverter. System size is 8kWDC/6kWAC New 225A Main service panel upgrade, New 200A Main breaker shall be permitted separately.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":52,"PERMIT_NBR":"21041-20000-15877","PRIMARY_ADDRESS":"12220 N KRISTOPHER PL","ZIP_CODE":"91326","CD":"12","PIN_NBR":"219B121   256","APN":"2820006016","ZONE":"RS-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Porter Ranch","HL":"YES","CT":"1081.04","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/27/2021 12:00:00 AM","ISSUE_DATE":"05/05/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"06/14/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.29434","LON":"-118.54357","WORK_DESC":"PV1.  Install 9.62 kW DC roof mounted PV system and 13.5 kWh energy storage system.  (26) modules with microinverters and (1) 13.5 kWh AC-coupled energy storage unit","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":53,"PERMIT_NBR":"23041-20000-33733","PRIMARY_ADDRESS":"5221 N TOPEKA DR","ZIP_CODE":"91356","CD":"3","PIN_NBR":"171B121   322","APN":"2163024021","ZONE":"RA-1","APC":"South Valley","CPA":"Encino - Tarzana","CNC":"Tarzana","HL":null,"CT":"1394.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/25/2023 12:00:00 AM","ISSUE_DATE":"06/02/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"06/23/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.16505","LON":"-118.54672","WORK_DESC":"Plan check forPV roof mounted system, PV System size: 15.58KW DC, 14.257KW AC CEC with 38 PV Modules and 38 micro-inverters","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":54,"PERMIT_NBR":"24041-10000-19810","PRIMARY_ADDRESS":"6053 W CENTURY BLVD","ZIP_CODE":"90045","CD":"11","PIN_NBR":"093B169   305","APN":"4124030902","ZONE":"LAX","APC":"West Los Angeles","CPA":"Los Angeles International Airport","CNC":"Westchester/Playa","HL":null,"CT":"9800.28","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/19/2024 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Corrections Issued","STATUS_DATE":"05/23/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.94648","LON":"-118.38998","WORK_DESC":"[EPLAN] FULL PC FOR TI WORK ON FLOORS 2-11 OF EXISTING HIGH-RISE BUILDING. SCOPE INCLUDES NEW SUB PANELS, CIRCUITS, RECEPTACLES, LIGHTING, CONTROLS. TOTAL AFFECTED AREA IS 163,475 SQFT.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":55,"PERMIT_NBR":"24041-20000-19767","PRIMARY_ADDRESS":"15457 W VALLEY VISTA BLVD","ZIP_CODE":"91403","CD":"4","PIN_NBR":"165B141   535","APN":"2283020010","ZONE":"R1-1","APC":"South Valley","CPA":"Encino - Tarzana","CNC":"Encino","HL":null,"CT":"1414.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/17/2024 12:00:00 AM","ISSUE_DATE":"04/17/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"04/22/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.1498","LON":"-118.47206","WORK_DESC":"Install 6.56 kW DC roof mounted PV system.  (16) modules with microinverters.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":56,"PERMIT_NBR":"22041-10000-11669","PRIMARY_ADDRESS":"1917 W 3RD ST","ZIP_CODE":"90057","CD":"1","PIN_NBR":"135A205   322","APN":"5154020033","ZONE":"C2-1","APC":"Central","CPA":"Westlake","CNC":"Westlake North","HL":null,"CT":"2084.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/31/2022 12:00:00 AM","ISSUE_DATE":"12/30/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"12/30/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.06225","LON":"-118.2707","WORK_DESC":"[EPLAN] Methane system for new 137 unit apartment building, Level 5","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":57,"PERMIT_NBR":"24041-10000-15885","PRIMARY_ADDRESS":"10330 W TENNESSEE AVE","ZIP_CODE":"90064","CD":"5","PIN_NBR":"129B161   242","APN":"4315016025","ZONE":"R1-1-O","APC":"West Los Angeles","CPA":"West Los Angeles","CNC":"Westside","HL":null,"CT":"2679.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/04/2024 12:00:00 AM","ISSUE_DATE":"04/12/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"05/23/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.04991","LON":"-118.41631","WORK_DESC":"[eplan] Install 12.91 kW DC roof mounted PV system.  (29) modules with microinverters.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":58,"PERMIT_NBR":"20041-20000-23777","PRIMARY_ADDRESS":"13640 W ROSCOE BLVD","ZIP_CODE":"91402","CD":"6","PIN_NBR":"192B157   676","APN":"2213021020","ZONE":"P-1VL, [Q]C1-1, [Q]CR-1VL","APC":"North Valley","CPA":"Mission Hills - Panorama City - North Hills","CNC":"Panorama City","HL":null,"CT":"1204.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/21/2020 12:00:00 AM","ISSUE_DATE":"10/09/2020 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"04/07/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.2215","LON":"-118.42999","WORK_DESC":"Replacement of general radiology equipment in existing medical office.  Replacment of fluorescent lighting with LED.  Plan check for power and energy.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":59,"PERMIT_NBR":"20041-20000-40630","PRIMARY_ADDRESS":"1848 S ANCHOVY AVE","ZIP_CODE":"90732","CD":"15","PIN_NBR":"012B189   258","APN":"7562020017","ZONE":"R1-1XL","APC":"Harbor","CPA":"San Pedro","CNC":"Coastal San Pedro","HL":"YES","CT":"2974.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/25/2020 12:00:00 AM","ISSUE_DATE":"01/08/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"01/08/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.72788","LON":"-118.31999","WORK_DESC":"Plan check for PV roof mounted system Energy Storage System, PV system size: 10.66KW with 26 PV Modules and 26 microinverters and 1 Energy Storage Device.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":60,"PERMIT_NBR":"23041-10000-72045","PRIMARY_ADDRESS":"12215 W VICTORY BLVD 222","ZIP_CODE":"91606","CD":"2","PIN_NBR":"180B165   716","APN":"2322006024","ZONE":"C2-1L","APC":"South Valley","CPA":"North Hollywood - Valley Village","CNC":"North Hollywood Northeast","HL":null,"CT":"1239.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/06/2023 12:00:00 AM","ISSUE_DATE":"05/23/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"05/23/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.18684","LON":"-118.39918","WORK_DESC":"[EPLAN] PC FOR T24 ENERGY COMPLIANCE.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":61,"PERMIT_NBR":"21041-10001-94518","PRIMARY_ADDRESS":"7870 W BECKETT ST","ZIP_CODE":"91040","CD":"7","PIN_NBR":"204B193  1114","APN":"2559026002","ZONE":"R1-1-RFA","APC":"North Valley","CPA":"Sunland-E LaTuna Cyn-Lakevw Ter-Shadow Hls-Tu","CNC":"Sunland-Tujunga","HL":null,"CT":"1034.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/09/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"05/09/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.25365","LON":"-118.30466","WORK_DESC":"(EPlan) PV1 PC for installation of roof mounted solar panels.  PV system includes 20 modules, 1 Powerwall+ (central inverter system and energy strage system combination), 1 load center, and 1 Tesla Backup Gateway connected to main service panel.  System size is 8.5KW DC/7.6KW AC.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":62,"PERMIT_NBR":"21041-10000-28106","PRIMARY_ADDRESS":"20220 W LEADWELL ST","ZIP_CODE":"91306","CD":"3","PIN_NBR":"186B113   750","APN":"2114018218","ZONE":"R1-1","APC":"South Valley","CPA":"Canoga Park-West Hills-Winnetka-Woodland Hills","CNC":"Winnetka","HL":null,"CT":"1347.20","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/19/2021 12:00:00 AM","ISSUE_DATE":"07/27/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"02/18/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.20337","LON":"-118.57374","WORK_DESC":"PV1. Installation of roof mounted solar modules using micro inverter PV system. System size: 9.52 KW DC, 7.0 KW AC  with (28) PV Modules (340W) with microinverters (IQ7-60-2-US).","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":63,"PERMIT_NBR":"23041-10000-07604","PRIMARY_ADDRESS":"7224 S HOBART BLVD","ZIP_CODE":"90047","CD":"8","PIN_NBR":"102B193  1530","APN":"6018002010","ZONE":"R1-1","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":"Empowerment Congress Southwest Area","HL":null,"CT":"2379.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"02/08/2023 12:00:00 AM","ISSUE_DATE":"03/14/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"05/02/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.97373","LON":"-118.30772","WORK_DESC":"[ePlan] Installation of (10) modules with optimizers, (1) central inverter, (1) 100A sub panel connected to new MSP. System size is 4.4kW DC / 3.8kW AC. New MSP to be pulled under separate permit.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":64,"PERMIT_NBR":"22041-10000-50078","PRIMARY_ADDRESS":"8420 N FALLBROOK AVE","ZIP_CODE":"91304","CD":"12","PIN_NBR":"192B097   140","APN":"2004014002","ZONE":"RE11-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"West Hills","HL":null,"CT":"1132.32","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/10/2022 12:00:00 AM","ISSUE_DATE":"03/23/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"09/28/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.22366","LON":"-118.6233","WORK_DESC":"[EPLAN] PV1+ESS. ROOF TOP PV, SYSTEM SIZE IS 8.875 KW DC (6.0 KW AC) USING 25 MODULES, 25 OPTIMIZERS AND 1 INVERTER,  1 LG BATTERY 9.8 KWH, A BACKUP INTERFACE DEVICE AND A NBACKUP LC. MPU TO BE PERMITTED SEPARATELY.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":65,"PERMIT_NBR":"22041-10000-15080","PRIMARY_ADDRESS":"6007 S ARLINGTON AVE","ZIP_CODE":"90043","CD":"8","PIN_NBR":"105B189   575","APN":"4007002017","ZONE":"R1-1","APC":"South Los Angeles","CPA":"West Adams - Baldwin Hills - Leimert","CNC":"Park Mesa Heights","HL":null,"CT":"2348.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/06/2022 12:00:00 AM","ISSUE_DATE":"06/01/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"06/29/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.98527","LON":"-118.31879","WORK_DESC":"[ePlan][PV1]Installation of a new 3.8kWAC PV system with 11 modules, 1 central iverter, and 1 9.6kWh ESS.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":66,"PERMIT_NBR":"23041-10000-39383","PRIMARY_ADDRESS":"22735 W DEL VALLE ST","ZIP_CODE":"91364","CD":"3","PIN_NBR":"171B097   453","APN":"2040031027","ZONE":"R3-1","APC":"South Valley","CPA":"Canoga Park-West Hills-Winnetka-Woodland Hills","CNC":"Woodland Hills-Warner Center","HL":null,"CT":"1372.03","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/22/2023 12:00:00 AM","ISSUE_DATE":"11/01/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"11/01/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.16576","LON":"-118.62159","WORK_DESC":"E-PLAN. NEW 3-STORY, 8 UNIT + ADU  LOW-RISE RESIDENTIAL BUILDING. ELECTRICAL SUBMITTAL FOR ENERGY AND POWER REQUIREMENTS.NEW 600A, 120/240V, 3PH, 4WIRE ELECTRICAL SERVICE FROM LADWP.BUILDING APPLICATION: 20010-20000-02768 (B20VN10500)","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":67,"PERMIT_NBR":"22041-10000-32280","PRIMARY_ADDRESS":"879 W 190TH ST STE 100","ZIP_CODE":"90248","CD":"15","PIN_NBR":"060B197   499","APN":"6121021012","ZONE":"M2-1","APC":"Harbor","CPA":"Harbor Gateway","CNC":"Harbor Gateway South","HL":null,"CT":"2913.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/21/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"01/11/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.85951","LON":"-118.28963","WORK_DESC":"EPLAN. PLAN CHECK FOR HEALTH CARE FACILITY,  SCOPE OF WORK INCLUDES 100A PANEL AND CIRCUITS. INSTALLING INDOOR LIGHTING AND CONTROLS. TOTAL ENERGY AFFECTED AREA: 6069 SQ. FT. ******BUILDING WORK DESCRIPTION*******CHANGE OF USE TO MEDICAL OFFICE","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":68,"PERMIT_NBR":"21141-10000-25104","PRIMARY_ADDRESS":"22521 W BALLINGER ST","ZIP_CODE":"91311","CD":"12","PIN_NBR":"201B097   169","APN":"2727001038","ZONE":"RA-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Chatsworth","HL":null,"CT":"1132.37","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/14/2021 12:00:00 AM","ISSUE_DATE":"12/22/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"03/11/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.24346","LON":"-118.6178","WORK_DESC":"(EPlan) Plan check for installation of 2 energy storage system, 1 generation load panel, 1 critical load panel,  and 1 Tesla backup gateway gateway connected to existing main service panel.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":69,"PERMIT_NBR":"24041-10000-09145","PRIMARY_ADDRESS":"11711 W CANTON PL","ZIP_CODE":"91604","CD":"4","PIN_NBR":"159B169   300","APN":"2377021001","ZONE":"RE15-1-H","APC":"South Valley","CPA":"Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass","CNC":"Studio City","HL":"YES","CT":"1438.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"02/22/2024 12:00:00 AM","ISSUE_DATE":"02/29/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"02/29/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.13319","LON":"-118.38881","WORK_DESC":"[EPLAN] NEW ROOFTOP MOUNTED PV1 INSTALLATION WITH (23) MODULES, (6) MICRO-INVERTERS, ( 1)  COMBINER PANEL ALL INTERCONNECTED TO AN EXISTING 200A MSP. (SYSTEM SIZE IS: 10.35KWDC / 8.54KWAC.**NOTE** MSP DERATE SHALL BE PULLED UNDER A SEPARATE EXPRESS PERMIT**","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":70,"PERMIT_NBR":"20041-20001-28218","PRIMARY_ADDRESS":"8936 N GLENOAKS BLVD","ZIP_CODE":"91352","CD":"6","PIN_NBR":"195B173   170","APN":"2408005029","ZONE":"C2-1VL-CUGU","APC":"North Valley","CPA":"Sun Valley - La Tuna Canyon","CNC":"Sun Valley Area","HL":null,"CT":"1211.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/15/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"09/30/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.2312","LON":"-118.36756","WORK_DESC":"Revisions to approved plans.  Revision to SLD, power and lighting plans, updated Title 24 forms.  Review for energy only.**********Previouse Work Description*************Plan check for energy/T-24 compliance. Scope of work includes installation of new lighting, panel, equipment under 400A of load. Total affected area: 3340 sq ft.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":71,"PERMIT_NBR":"22041-10000-63436","PRIMARY_ADDRESS":"5548 N ELMER AVE","ZIP_CODE":"91601","CD":"2","PIN_NBR":"174B173  1081","APN":"2350006010","ZONE":"R4-1L","APC":"South Valley","CPA":"North Hollywood - Valley Village","CNC":"NoHo","HL":null,"CT":"1253.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/05/2022 12:00:00 AM","ISSUE_DATE":"12/16/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Issued","STATUS_DATE":"12/16/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.1714","LON":"-118.37619","WORK_DESC":"[eplan] Installation of fire alarm system in apartment building.  (42) signaling line and notification devices with FACP.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":72,"PERMIT_NBR":"21041-20002-14349","PRIMARY_ADDRESS":"2336 N HIDALGO AVE","ZIP_CODE":"90039","CD":"13","PIN_NBR":"147A209    45","APN":"5440016026","ZONE":"R2-1VL","APC":"East Los Angeles","CPA":"Silver Lake - Echo Park - Elysian Valley","CNC":"Silver Lake","HL":"YES","CT":"1873.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"08/09/2021 12:00:00 AM","ISSUE_DATE":"09/14/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"10/07/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.09887","LON":"-118.25635","WORK_DESC":"Revision to approved plans.  Reduction in module count and system size: module count reduced to (41) and corresponding system rating down to 13.94 kW DC.  Equipment location changes, removal of ESS fused disconnects, updated fault currents.PV1.  NEW ROOF MOUNTED PV SYSTEM AND ESS. ESS SIZE IS 40.5 KWH. PV SYSTEM SIZE IS 16.32 KW DC/15.2 KW AC. SCOPE OF WORK CONSISTS OF (48) PV MODULES, (2) INVERTERS, A PANEL, AND (3) BATTERIES","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":73,"PERMIT_NBR":"18041-20001-40663","PRIMARY_ADDRESS":"13654 W BASSETT ST","ZIP_CODE":"91405","CD":"2","PIN_NBR":"183B157   761","APN":"2328012003","ZONE":"[Q]R3-1","APC":"South Valley","CPA":"Van Nuys - North Sherman Oaks","CNC":"Greater Valley Glen","HL":null,"CT":"1235.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/28/2020 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"04/29/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.19567","LON":"-118.43078","WORK_DESC":"Revisions to approved plans.  Relocation of pullbox and house meter at grade level.  Change of switchgear manufacturer.  Minor architectural revisions.(((New 19-unit apartment building with three stories over basement.  1200A 208/120V 3ph-4w service.  Plan check for power and energy.)))","EV":"N","Solar":"N","business_unit":"Expanded Counter Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":74,"PERMIT_NBR":"23041-10000-24297","PRIMARY_ADDRESS":"200 WORLD WAY 250","ZIP_CODE":"90045","CD":"11","PIN_NBR":"093B165   167","APN":"4117034900","ZONE":"LAX","APC":"West Los Angeles","CPA":"Los Angeles International Airport","CNC":"Westchester/Playa","HL":null,"CT":"9800.28","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"04/17/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Reviewed by Supervisor","STATUS_DATE":"04/28/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.94558","LON":"-118.4039","WORK_DESC":"[EPLAN] FULL POWER AN ENERGY PLAN CHECK FOR A FIRST TIME TENANT. SCOPE OF WORK INCLUDES NEW LIGHTING, CIRCUITS, POWER, AND EQUIPMENT. TOTAL INDOOR LIGHITNG AREA IS APPROXIMATELY 1147 SQFT.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":75,"PERMIT_NBR":"22041-10001-23364","PRIMARY_ADDRESS":"13635 W VOSE ST","ZIP_CODE":"91405","CD":"2","PIN_NBR":"183B157   344","APN":"2328033044","ZONE":"R1-1","APC":"South Valley","CPA":"Van Nuys - North Sherman Oaks","CNC":"Greater Valley Glen","HL":null,"CT":"1235.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"08/15/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"08/17/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.19855","LON":"-118.4301","WORK_DESC":"Eplan:Plan Check Only Change to an approved set. Changes include revision of panel layout and change from (36) Modules to (35) Modules.  Inspector wants updated layout stamped to match with field installation.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":76,"PERMIT_NBR":"21041-10000-18803","PRIMARY_ADDRESS":"292 E 49TH ST","ZIP_CODE":"90011","CD":"9","PIN_NBR":"111A205   231","APN":"5109008016","ZONE":"RD1.5-1","APC":"South Los Angeles","CPA":"Southeast Los Angeles","CNC":"Zapata-King","HL":null,"CT":"2293.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/17/2021 12:00:00 AM","ISSUE_DATE":"05/20/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"07/03/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.99815","LON":"-118.27051","WORK_DESC":"PV1. New solar system on existing residential roof-top. Total system size is 3.0KWacNote:292 is the 1st unit (full duplex address is 292-294 E 49th St)new bldg PCIS #: 20010-10000-03261","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":77,"PERMIT_NBR":"20041-10001-41072","PRIMARY_ADDRESS":"10714 W CHARNOCK ROAD","ZIP_CODE":"90034","CD":"5","PIN_NBR":"120B161  1158","APN":"4252033015","ZONE":"R3-1","APC":"West Los Angeles","CPA":"Palms - Mar Vista - Del Rey","CNC":"Palms","HL":null,"CT":"2718.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/15/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Info Complete","STATUS_DATE":"08/18/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.02219","LON":"-118.41034","WORK_DESC":"**Francis Ysaguirre** Supplemental changes to approved plans. Added SP-3 & SP-4 (3hp) Each 9.6A each. Revised Stair Lights Arch. Bkgnd Change Ground Flr through Fourth Floor. Stair # & 4, PC# 20041-10000-41072                 E20LA06356","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":78,"PERMIT_NBR":"21041-10000-25824","PRIMARY_ADDRESS":"1242 S CITRUS AVE","ZIP_CODE":"90019","CD":"10","PIN_NBR":"129B181   299","APN":"5084027022","ZONE":"R3-1-O","APC":"Central","CPA":"Wilshire","CNC":"Olympic Park","HL":null,"CT":"2172.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/02/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"07/30/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.05205","LON":"-118.34282","WORK_DESC":"[EPLAN] PV1, PC ONLY FOR THE INSTALLATION OF 6 AC MODULES TO AN EXISTING SYSTEM THAT ORGINALLY CONTAINED  9 AC MODULES. SERICE SIZE FOR THE NEW MODULES IS 2KWac, TOTAL SYSTEM SIZE IS 5.2KWac. PERMIT FEES WERE PAID UNDER  21041-90K-19462","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":79,"PERMIT_NBR":"22041-10000-52154","PRIMARY_ADDRESS":"7510 S FIGUEROA ST","ZIP_CODE":"90003","CD":"8","PIN_NBR":"102B201  1433","APN":"6020032900","ZONE":"PF-1","APC":"South Los Angeles","CPA":"South Los Angeles","CNC":null,"HL":null,"CT":"2377.10","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/11/2022 12:00:00 AM","ISSUE_DATE":"10/11/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/01/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.97137","LON":"-118.28248","WORK_DESC":"ALTERATION 1 FOR 1 REPLACEMENT OF HID TO NEW LED FIXTURE. OUTDOOR TITLE 24 ONLY.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":80,"PERMIT_NBR":"21041-10003-30277","PRIMARY_ADDRESS":"2051 N CUMMINGS DR","ZIP_CODE":"90027","CD":"4","PIN_NBR":"151-5A195 137","APN":"5589003014","ZONE":"RE11-1","APC":"Central","CPA":"Hollywood","CNC":"Los Feliz","HL":"YES","CT":"1893.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/01/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"06/03/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.10868","LON":"-118.30205","WORK_DESC":"(E-PLAN)CHANGES TO AN APPROVED SET FOR 21041-10000-30277. SCOPE OF WORK INCLUDES CHANGES TO SITE PLAN, A REDUCTION OF 1 MODULE, A CHANGE IN SIZE FOR THE COMBINER BOX, AND PLACARAD.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":81,"PERMIT_NBR":"24041-10000-21814","PRIMARY_ADDRESS":"8561 N EATOUGH AVE","ZIP_CODE":"91304","CD":"12","PIN_NBR":"192B101    38","APN":"2010017004","ZONE":"RE11-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"West Hills","HL":"YES","CT":"1132.32","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/01/2024 12:00:00 AM","ISSUE_DATE":"05/08/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"06/06/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.22632","LON":"-118.61019","WORK_DESC":"[ePlanLA] New roof mounted solar PV1 system with (24) AC modules and (1) combiner box connected to existing MSP with new derated 175A MCB. System is rated 8.0kW DC / 7.5kW AC. Existing PV system is present. ***MCB derate to be under separate permit.***","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":82,"PERMIT_NBR":"23041-10003-30937","PRIMARY_ADDRESS":"14301 W SAN JOSE ST","ZIP_CODE":"91345","CD":"7","PIN_NBR":"207B153   514","APN":"2617011028","ZONE":"RS-1-O","APC":"North Valley","CPA":"Mission Hills - Panorama City - North Hills","CNC":"Mission Hills","HL":null,"CT":"1096.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/21/2024 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"03/28/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.26394","LON":"-118.44506","WORK_DESC":"Eplan;change to an approved set by updating the roof layout to meet (LAFD) FPB REQUIREMENTS No. 96, removing a load center, and reconnect all the backfeed to the main service panel,  all changes under clouded area only.Note, this application is for plan check only, permit shall be under original/ master application.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":83,"PERMIT_NBR":"20041-20001-40097","PRIMARY_ADDRESS":"2600 S SEPULVEDA BLVD","ZIP_CODE":"90064","CD":"5","PIN_NBR":"123B157   771","APN":"4256015011","ZONE":"R3-1","APC":"West Los Angeles","CPA":"West Los Angeles","CNC":"Westside","HL":null,"CT":"2711.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/19/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"09/06/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.0329","LON":"-118.43217","WORK_DESC":"Revisions to approved plans.  Removal of conduit sealing, change of service disconnect location, miscellaenous equipment ID updates.(((Full plan check for a 1600 A, 120/240Volt, 3 Ph, 4 W, Delta service supplying a 43-unit 6-story building. Total common lighting area: 32,783 sq ft.)))","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":84,"PERMIT_NBR":"22041-10001-54235","PRIMARY_ADDRESS":"5401 N GENESTA AVE","ZIP_CODE":"91316","CD":"4","PIN_NBR":"171B133    25","APN":"2258028003","ZONE":"RA-1","APC":"South Valley","CPA":"Encino - Tarzana","CNC":"Encino","HL":null,"CT":"1396.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/20/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"10/29/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.16924","LON":"-118.50342","WORK_DESC":"EPLAN. NEW PV1 ROOF MOUNTED SOLAR. SCOPE: 36 MODULES, 36 POWER OPTIMIZER, 1 CENTERAL INVERTER, AND EXISTING SERVICE. SYSTEM SIZE: 14.5KW DC/ 10.0KW AC","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":85,"PERMIT_NBR":"22041-10000-52741","PRIMARY_ADDRESS":"8520 W SKYLINE DR","ZIP_CODE":"90046","CD":"4","PIN_NBR":"153B169   141","APN":"5565033003","ZONE":"RE40-1-H-HCR","APC":"South Valley","CPA":"Bel Air - Beverly Crest","CNC":"Bel Air-Beverly Crest","HL":"YES","CT":"2611.03","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"10/13/2022 12:00:00 AM","ISSUE_DATE":"12/01/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"01/31/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.1175","LON":"-118.38652","WORK_DESC":"[E-Plan] New PV1 roof mounted solar system consisting of 39 modules ( Q.PEAK DUO L-G8 430 MODULES) with 39 optimizers (P485) and 1 central inverter (SE11400H-US). System size is 16.77kWDC/11.4kWAC","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":86,"PERMIT_NBR":"21141-10000-18207","PRIMARY_ADDRESS":"8513 S CROYDON AVE","ZIP_CODE":"90045","CD":"11","PIN_NBR":"096B165   463","APN":"4107030017","ZONE":"R1-1","APC":"West Los Angeles","CPA":"Westchester - Playa del Rey","CNC":"Westchester/Playa","HL":null,"CT":"2760.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/16/2021 12:00:00 AM","ISSUE_DATE":"01/05/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/28/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.96063","LON":"-118.39262","WORK_DESC":"[ePlan][PV1]Installation of a new 7.6kW PV system with 26 modules, 2 central inverters, 125A backup panel, and 1 ESS.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":87,"PERMIT_NBR":"21041-10000-27065","PRIMARY_ADDRESS":"10043 N KEOKUK AVE","ZIP_CODE":"91311","CD":"12","PIN_NBR":"204B113   547","APN":"2741015011","ZONE":"RS-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Chatsworth","HL":null,"CT":"1133.22","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/13/2021 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"Verifications in Progress","STATUS_DATE":"08/24/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.25314","LON":"-118.57432","WORK_DESC":"[ePlan] PV1. Installation of roof mounted solar using central inverter PV system. System size: 4.96 KW DC, with (85) Tesla Solar glass Modules (SR60T1) with optimizers and (1) central inverter (Tesla 3.8 kW), (2) ESS (5KW), and (1) 225A subpanel.","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":88,"PERMIT_NBR":"20041-10000-41945","PRIMARY_ADDRESS":"3001 N ARROWHEAD DR","ZIP_CODE":"90068","CD":"4","PIN_NBR":"156B185    95","APN":"5577035036","ZONE":"RE15-1-H","APC":"Central","CPA":"Hollywood","CNC":"Hollywood United","HL":"YES","CT":"1897.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"12/06/2020 12:00:00 AM","ISSUE_DATE":"12/15/2020 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"11/30/2021 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.1238","LON":"-118.32884","WORK_DESC":"(E-PLAN) NEW PV1 ROOF-MOUNTED INSTALLATION FOR A 600 AMP MSP. SCOPE OF WORK INCLUDES 79 MODULES, 79 OPTIMIZERS, 3 CENTRAL INVERTERS, AND 1 PANEL OF 200 AMPS.SYSTEM SIZE: 31.6 KW DC; 30 KW ACSolar PV installation shall comply with Los Angeles Fire Department's Fire Prevention Bureau (FPB) Requirement No. 96","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":89,"PERMIT_NBR":"23041-10001-43133","PRIMARY_ADDRESS":"8635 W METZ PL","ZIP_CODE":"90069","CD":"4","PIN_NBR":"147B173   497","APN":"5559017008","ZONE":"R1-1-HCR","APC":"Central","CPA":"Hollywood","CNC":"Bel Air-Beverly Crest","HL":"YES","CT":"1942.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"11/15/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"11/16/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.09607","LON":"-118.37966","WORK_DESC":"[EPLAN] Revisions to approved plans. Revised the Page S-1. The roof informtaion revised. PC only, permit under master.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":90,"PERMIT_NBR":"21041-10000-27756","PRIMARY_ADDRESS":"4533 W COCKERHAM DR","ZIP_CODE":"90027","CD":"4","PIN_NBR":"153B197   205","APN":"5588023031","ZONE":"RE11-1","APC":"Central","CPA":"Hollywood","CNC":"Los Feliz","HL":"YES","CT":"1892.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/15/2021 12:00:00 AM","ISSUE_DATE":"09/23/2021 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"07/21/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.11439","LON":"-118.29155","WORK_DESC":"(EPLAN) POWER PLAN CHECK ONLY TO COCKERHAM RESIDENCE. SCOPE OF WORK INLCUDES A NEW SERVICE RATED FOR 1200A  240/120V 1P-3W, HVAC EQUIPMENT TO BE INSTALLED, 1 ELEVATOR, ELECTRIC CHARGER, STEAM EQUIPMENT, AND PANELBOARDS.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":91,"PERMIT_NBR":"22041-10000-26805","PRIMARY_ADDRESS":"2901 W LOS FELIZ BLVD","ZIP_CODE":"90039","CD":"13","PIN_NBR":"159B205   502","APN":"5594006020","ZONE":"[Q]C4-1XL-RIO-POD, [T][Q]M1-1VL-RIO","APC":"East Los Angeles","CPA":"Northeast Los Angeles","CNC":"Atwater Village","HL":null,"CT":"1881.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/10/2022 12:00:00 AM","ISSUE_DATE":"06/21/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"10/25/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.12774","LON":"-118.26247","WORK_DESC":"EPLAN. NEW LIGHTING AND CIRCUITS. PLAN CHECK FOR ENERGY/TITLE-24.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":92,"PERMIT_NBR":"24041-10000-00940","PRIMARY_ADDRESS":"10140 N WEALTHA AVE","ZIP_CODE":"91352","CD":"7","PIN_NBR":"204B173   190","APN":"2528017032","ZONE":"RA-1-K","APC":"North Valley","CPA":"Sun Valley - La Tuna Canyon","CNC":"Foothill Trails District","HL":null,"CT":"1211.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/15/2024 12:00:00 AM","ISSUE_DATE":"01/29/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"02/09/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.25468","LON":"-118.37598","WORK_DESC":"[eplan] Install 10.6 kW DC roof mounted PV system.  (26) modules with (14) microinverters.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":93,"PERMIT_NBR":"23041-10000-57289","PRIMARY_ADDRESS":"287 S 26TH ST","ZIP_CODE":"90402","CD":"11","PIN_NBR":"129B137   580","APN":"4264001012","ZONE":"C1-1XLD","APC":"West Los Angeles","CPA":"Brentwood - Pacific Palisades","CNC":null,"HL":null,"CT":"2643.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/21/2023 12:00:00 AM","ISSUE_DATE":"10/24/2023 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"12/14/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.04691","LON":"-118.48999","WORK_DESC":"T24 energy only plan check for existing bank TI. Scope includes new lighting, controls, receptacles. Total affected area is 2296 sqft.","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":94,"PERMIT_NBR":"21141-10000-19035","PRIMARY_ADDRESS":"3070 S DANNYHILL DR","ZIP_CODE":"90064","CD":"5","PIN_NBR":"123B165   228","APN":"4316027020","ZONE":"R1V2","APC":"West Los Angeles","CPA":"West Los Angeles","CNC":"Westside","HL":null,"CT":"2690.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"01/05/2022 12:00:00 AM","ISSUE_DATE":"01/11/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"10/25/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.03589","LON":"-118.40248","WORK_DESC":"PV1 system. Installation of new roof mounted PV system. System size is 3.12kW AC. Scope of work includes (13) PV modules, (13) microinverters, and a combiner box.","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":95,"PERMIT_NBR":"24041-10000-22183","PRIMARY_ADDRESS":"7654 N BABCOCK AVE","ZIP_CODE":"91605","CD":"2","PIN_NBR":"186B161    58","APN":"2307002018","ZONE":"R1-1","APC":"North Valley","CPA":"Sun Valley - La Tuna Canyon","CNC":"North Hollywood West","HL":null,"CT":"1210.20","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"05/02/2024 12:00:00 AM","ISSUE_DATE":"05/06/2024 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"05/08/2024 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.21023","LON":"-118.40624","WORK_DESC":"PV1 PLAN CHECK FOR NEW ROOF MOUNTED PV SYSTEM. SYSTEM SIZE IS 3.6 KW DC/3.258 KW AC. SCOPE OF WORK CONSISTS OF (8) PV MODULES WITH (2) MICROINVERTERS","EV":"N","Solar":"Y","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":96,"PERMIT_NBR":"20041-10000-24283","PRIMARY_ADDRESS":"8308 N MAYNARD AVE","ZIP_CODE":"91304","CD":"12","PIN_NBR":"192B097   432","APN":"2004001013","ZONE":"RE11-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"West Hills","HL":null,"CT":"1132.32","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"07/23/2020 12:00:00 AM","ISSUE_DATE":"08/13/2020 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"08/25/2020 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.21984","LON":"-118.62268","WORK_DESC":"[ePlan] Plan check for PV and Energy Storage System installed in to existing PV system,  additiona PV systrem size: 3.0KW DC with 8 PV moduels and (1) LG Chem RESU 10H  Energy Storage and (1) 100A critical load panel, existing 7.6KW inverter","EV":"N","Solar":"Y","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":97,"PERMIT_NBR":"22041-10000-11738","PRIMARY_ADDRESS":"520 S KINGSLEY DR","ZIP_CODE":"90020","CD":"10","PIN_NBR":"135B193  1031","APN":"5503024***","ZONE":"R4-2","APC":"Central","CPA":"Wilshire","CNC":"Wilshire Center-Koreatown","HL":null,"CT":"2118.02","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"03/17/2022 12:00:00 AM","ISSUE_DATE":"03/17/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"05/11/2022 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.06481","LON":"-118.30266","WORK_DESC":"Alteration (1) for (1) replacement of HID to NEW LED fixture - T24 OnlyOUTDOOR","EV":"N","Solar":"N","business_unit":"Plan Check at Counter","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":98,"PERMIT_NBR":"23041-10001-11261","PRIMARY_ADDRESS":"19746 W MARIPOSA CREEK WAY","ZIP_CODE":"91326","CD":"12","PIN_NBR":"213B113   180","APN":"2701028016","ZONE":"RD6-1","APC":"North Valley","CPA":"Chatsworth - Porter Ranch","CNC":"Porter Ranch","HL":"YES","CT":"1082.04","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"1 or 2 Family Dwelling","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"02/22/2023 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Approved","STATUS_DATE":"03/20/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.28201","LON":"-118.56589","WORK_DESC":"expedite[EPLAN] PV1+ESS.  Installing 6.32 kw dc roof top photovoltaic system usingn 16 panels, 16 optimizers, 1 inverter, 1 LG battery back 9.8 kwh, a microgrid interconnect device and a backp LC.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":99,"PERMIT_NBR":"22041-10000-29643","PRIMARY_ADDRESS":"5847 E ARROYO DR","ZIP_CODE":"90042","CD":"1","PIN_NBR":"150A229    65","APN":"5492009033","ZONE":"RD2-1","APC":"East Los Angeles","CPA":"Northeast Los Angeles","CNC":"Historic Highland Park","HL":"YES","CT":"1837.01","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Apartment","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"06/28/2022 12:00:00 AM","ISSUE_DATE":null,"COFO_DATE":null,"STATUS_DESC":"PC Info Complete","STATUS_DATE":"02/05/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"34.10636","LON":"-118.18822","WORK_DESC":"E-plan. New 800 amps 120/240V 3phase service. New distribution board new panels and lighting.  \"(N) 3-story 9 Unit Apartment Building\"","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"},{"_id":100,"PERMIT_NBR":"20041-10001-32068","PRIMARY_ADDRESS":"5500 W 98TH ST QTA","ZIP_CODE":"90045","CD":"11","PIN_NBR":"093B173   581","APN":"4128022906","ZONE":"LAX","APC":"West Los Angeles","CPA":"Los Angeles International Airport","CNC":"Westchester/Playa","HL":null,"CT":"2774.00","PERMIT_GROUP":"Electrical","PERMIT_TYPE":"Electrical","PERMIT_SUB_TYPE":"Commercial","USE_CODE":null,"USE_DESC":null,"SUBMITTED_DATE":"09/20/2022 12:00:00 AM","ISSUE_DATE":"12/14/2022 12:00:00 AM","COFO_DATE":null,"STATUS_DESC":"Permit Finaled","STATUS_DATE":"12/07/2023 12:00:00 AM","TYPE_LAT_LON":"ADDRESS","LAT":"33.94764","LON":"-118.37749","WORK_DESC":"EPLAN. CHANGES TO AN APPROVED SET. CHANGES ARE CLOUDED AND INCLUDE THE ADDITION AND REMOVAL OF FIRE ALARM DEVICES.","EV":"N","Solar":"N","business_unit":"Regular Plan Check","REFRESH_TIME":"06/10/2024 12:00:00 AM"}], "fields": [{"id": "_id", "type": "int"}, {"id": "PERMIT_NBR", "type": "text"}, {"id": "PRIMARY_ADDRESS", "type": "text"}, {"id": "ZIP_CODE", "type": "text"}, {"id": "CD", "type": "text"}, {"id": "PIN_NBR", "type": "text"}, {"id": "APN", "type": "text"}, {"id": "ZONE", "type": "text"}, {"id": "APC", "type": "text"}, {"id": "CPA", "type": "text"}, {"id": "CNC", "type": "text"}, {"id": "HL", "type": "text"}, {"id": "CT", "type": "text"}, {"id": "PERMIT_GROUP", "type": "text"}, {"id": "PERMIT_TYPE", "type": "text"}, {"id": "PERMIT_SUB_TYPE", "type": "text"}, {"id": "USE_CODE", "type": "text"}, {"id": "USE_DESC", "type": "text"}, {"id": "SUBMITTED_DATE", "type": "text"}, {"id": "ISSUE_DATE", "type": "text"}, {"id": "COFO_DATE", "type": "text"}, {"id": "STATUS_DESC", "type": "text"}, {"id": "STATUS_DATE", "type": "text"}, {"id": "TYPE_LAT_LON", "type": "text"}, {"id": "LAT", "type": "text"}, {"id": "LON", "type": "text"}, {"id": "WORK_DESC", "type": "text"}, {"id": "EV", "type": "text"}, {"id": "Solar", "type": "text"}, {"id": "business_unit", "type": "text"}, {"id": "REFRESH_TIME", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=dc4273bb-d643-5ded-b585-f5b98cd38fac", "next": "/api/3/action/datastore_search?resource_id=dc4273bb-d643-5ded-b585-f5b98cd38fac&offset=100"}, "total": 53972, "total_was_estimated": false}}